Topping lift.
Posted: Sun Jun 07, 2009 5:00 pm
Newbie here. I am having trouble figuring out the topping lift on my C-26. I have 2 separate halyards that I think are the topping lift. There is a rope halyard that should lift the boom, but it also has a second line that is attached to the main line 10 inches from the top. This second line runs through a block so the main halyard lifts this second line as it lifts the end of the boom. What gives?