Brought the boat home for spring upgrades and projects, hope to be ready for the water by the time the marina has the docks in. (maybe 2 weeks).
1. design and sew pop-up inclosure
2. recover all cushions (help from grandma)
3. overhaul lower unit on Sailer 280 -DONE- post to come
4. oil the teak
5. repair small electrical issue
6. R&R trailer lights
7. wash and wax
