Passing this link for those of you who tie a couple of bowline knots to attach your jib to the sheets..and may have trouble with those big ole honkin' knots hanging up on the shrouds during tacks.
http://l-36.com/soft_shackle_intro.php
I think I may have posted that before I hauled EE I had started leaving the primary jib on board in a jib bag, and since I didn't need to untie the sheets I went to a single long sheet with a larkshead at the jib. And that solved my problem..
"Soft Shackles"
- EmergencyExit
- Site Admin
- Posts: 2954
- Joined: Wed Dec 10, 2003 5:02 pm
- Location: Mississippi Gulf Coast
- CaptainScott
- Site Admin
- Posts: 3112
- Joined: Wed Sep 24, 2008 10:46 am
- Location: Washington State
- Contact:
- Andiron120
- Posts: 135
- Joined: Fri Feb 20, 2009 9:28 am
- Location: Lake Whitney, Texas
I like it. Now I have ANOTHER project! LOL
Tom
1981 Endeavour 43 s/v Pearl Lee
Former 1976 Columbia Payne 9.6 s/v Gin Rhumby
Former 1979 Chrysler 26, s/v Copacetic
http://www.asswhaffleyachtclub.net
http://www.svpearllee.com
1981 Endeavour 43 s/v Pearl Lee
Former 1976 Columbia Payne 9.6 s/v Gin Rhumby
Former 1979 Chrysler 26, s/v Copacetic
http://www.asswhaffleyachtclub.net
http://www.svpearllee.com
-
- Posts: 165
- Joined: Mon Feb 15, 2010 12:46 pm
- Location: Missouri Ozarks