Page 1 of 1

Spring!

Posted: Mon Mar 29, 2010 11:19 am
by Capt. Bondo
The flood waters are receding and the ice is almost gone! :)
Brought the boat home for spring upgrades and projects, hope to be ready for the water by the time the marina has the docks in. (maybe 2 weeks).
1. design and sew pop-up inclosure
2. recover all cushions (help from grandma)
3. overhaul lower unit on Sailer 280 -DONE- post to come
4. oil the teak
5. repair small electrical issue
6. R&R trailer lights
7. wash and wax 8)

Posted: Mon Mar 29, 2010 1:14 pm
by Alanhod

Posted: Mon Mar 29, 2010 1:24 pm
by CaptainScott
Sheesh! I just want to get my keel back on! LOL!

I'll off to by some primer soon!

Scott

Posted: Mon Mar 29, 2010 1:31 pm
by tgentry
Much to do before launch:

Change gear oil and test the "new" motor
Convert the "new" motor to remote
Bottom Paint
Topside Paint (maybe)
Rewire trailer and install breakaway kit
Fix mast wiring and move antenna to mast
Reinstall life lines and stanchions

There's plenty more, but throughout the summer.